Copper & Brass Tube/Tube Coil

Insulation Copper Pipe Coil

    Grade:  C1220, DHP


    OD:  6.35mm - 22.225mm  (1/4"-7/8")


    Insulation Material: PVC


    Coil: Single Coil / Pair Coil


Shanghai Metal Corporation is a Chinese manufacturer of copper alloy tube, HVAC tube, seamless copper water/gas tube, The company's products cover hundreds of alloy numbers and thousands of specifications, are widely used in air conditioning and refrigeration, HAVC, water desalination, nuclear power, thermal power, equipment manufacturing, automotive industry, electrical, transportation, hardware machinery and other industries.

We take the careful control and tests on all of our products which are offered and supplied to the international markets. Our broad development know-how together with state-of-the-art production technology is the basis for excellent and high quality solutions. With detailed knowledge, competence and high flexibility for individual solutions, we are ready to extend our production scale. We can quickly meet our customers' and markets' demands.

If you want to know more about our copper tube or brass tube price please feel free to contact us, we will reply you within 24 hours.


Nature of Heat Insulator:

 

Normal Specifications of Single Pipe Coil: 

1) Customized Pipe is also available.(Max. length 50mtrs)

2) The size of the outer diameter and the thickness can be customized with special orders. 

 

Normal Specifications of Paired Pipe Coil: 

 

Manufacturing of Insulation Copper Pipe Coil

Packaging of Insulation Copper Pipe Coil

Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation. In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.

1) Shanghai Metal Standard

2) Customization

Q1.How long does sample preparation take?

A: Samples will be ready within 3–7 working days.


Q2.What information do you need for a quotation?

A: Please provide tube OD, wall thickness, length, temper, quantity and target application.


Q3.What is the MOQ and production lead time?

A: MOQ depends on specifications. Standard orders take 15–25 working days; customized orders take 25–40 working days.


Q4.What is the difference between O temper and H temper copper tube?

A: O temper has high elongation for bending on site; H temper is rigid, suitable for straight gas & pressure piping.


Q5.What quality standards does this C1220 copper tube meet?

A: Our copper tube complies with relevant ASTM standards for plumbing, gas and HVAC piping.

Products & Service
Click here for price
Click
here
for
price
* E-mail
* Contact Person
* Country
* Company name
WhatsApp
Tel

Home

Search

Inquiry

Top